Details: road works : ringanwada:- road work:- demolition including stacking of servicable materials and disposal of unserviceable materials with all lead and lift (i) rcc work earthwork in cuting in all sorts of soil and soft murrum including conveying and spreading the stuff, embankment as and where directed within 200meters from the end of the cutting with all required lead and lift. (a) all types of soil rolling and consolidation of soling including filling in depression which occur during the process, with power roler 8 tonne to 12 tonne. construction of subgrade :- earthwork for embankment including breaking clods, dressing with all lead and lift and including watering rolling and consolidation of ubgrade in layers at o.m.c. to required dry density including filling the depression which occur during the process using power roller 8t to 10t.(e) from borrow area within 3.0km. lead all complete as directed by engineer-in-charge. granual sub base- plant mix method (providing, laying, spread
Sector: District Administration