Details: items : excavation for foundation up to 1.5 mt. depth including sorting out and stacking of useful materials and disposing of the excavated stuff up to 50 meter lead. ( b ) dence or hard soil) providing, laying, spreading and compacting graded stone aggregate material , carriage of mix material, spreading in uniform layers including spreading of stone dust to fill up voids on the surface and watering compacting with vibratory roller including all materials, labour, machinery.etc completed. supplying and fixing reinforced concrete heavy duty non-pressure pipes with collars for culverts carrying heavy traffic as per is 458-1991 specifications including setting the pipes in c.m. 1:2 watering and laying (to level or slopes) of class np3 of following internal daimeters.(ii) 600 mm dia. (upto 10 ton) brick work using common burnt clay building bricks having crushing strength not less than 35 kg./sq.cm. in foundation and plinth in cement mortar 1:5. (1- cement : 5 -fine sand)(b) conve
Sector: District Administration