Details: pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) plain/reinforced cement concrete, in m30 retaining wall complete as per drawing and technical specification - rcc m30 grade with batching plant, transit mixer and concrete pump supplying, fitting and placing un-coated (tmt fe 500d grade) bar reinforcement of all categories for foundation of pier, abutment & retaining wall complete as per drawing and technical specifications. providing anti-corrosive treatment to tmt reinforcement with fusion bonded epoxy coating (fbec) granular sub-base with close graded material (table:- 400-1)plant mix method (construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surfac
Sector: Urban Authority