Details: section 1.0 civil work:- earthwork excavation for foundation upto 1.5 m depth including dewatering, sorting out and stacking of useful materials and disposing off the excavated stuff upto all lead & lift. dense or hard soil excavation for foundation for depth from 1.5 m to 3.0 m including dewatering, sorting out and stacking of useful materials and disposing off the excavated stuff upto all lead & lift. hard murrum excavation for foundation for depth from 1.5 m to 3.0 m including dewatering, sorting out and stacking of useful materials and disposing off the excavated stuff upto all lead & lift. soft rock not requiring blasting filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each desposited layer by ramming and watering. filling in foundation and plinth with murrum or selected soil brought from outside (including all lead and lift) in layers