Details: demolition including stacking of serviceable materilas and disposalof unserviceable materials upto 5km. lead and lift. (i) r.c.c. work excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 5 km lead.(b) dense or hard soil. filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering. providing and laying cement concrete 1:2:4 (1- cement : 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork in foundation and plinth, providing and fixing decastone neo grey dl r 80mm & decastone neo jetblack dl r 80mm with minimum average 400 kg/cm2 compessive strength at 28 days with design of vyara make, with ten different size of cobbles, with undulated surface, color specified by engineer in charge, using uv resistant col
Sector: Urban Authority