Description: Providing fixing and installation FRP huts in Menchuka Valley Dist Shi Yomi A P SH Civil work for base of FRP hut Name of Work Providing fixing and installation FRP huts in Menchuka Valley Dist Shi Yomi A P SH Civil work for base of FRP hut
Details: Y-Junction Base GR 307303 Map sheet no 82H/13 is 06 Km from last road head. Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary roack Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) Filling avai
Sector: Police and Internal Security