Description: Construction of wooden huts of Size 30x20 ft Meni valley Dist Upper Subansiri A P Name of Work Construction of wooden huts of Size 30x20 ft Meni valley Dist Upper Subansiri A P
Details: Location- SIEERA- 07 CP-02 (Ada) GR- 070908 Earth work in excavation over areas (exceeding 30 cm in depth 1.5 m in width as well as 10 Sqm in plan) including disposal of excavated earth, lead up to 50 m, disposed earth to be levelled and neatly dressed: All kinds of soil Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level.1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in pos
Sector: Police and Internal Security