Description: Construction of protection Wall at Upper left bank Hatti pubuh under PWD Doimukh Division Papum Pare Name of Work Construction of protection Wall at Upper left bank Hatti pubuh under PWD Doimukh Division Papum Pare
Details: SH : R.C.C. Retaining Wall 4.00mtr. Ht. Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material). Ordinary soil Manual Means upto 3 m depth Dry rubble Flooring complete as per drawing and Technical specification. PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days). Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. R.C.C. Grade M20. Case I, Using concrete mixer . Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications. Providing weep holes in Bric
Sector: PWD