Description: Extension and Strengthening of Spillway Channel of Mai MHS Ph II 2 x 500 kW Name of Work Extension and Strengthening of Spillway Channel of Mai MHS Ph II 2 x 500 kW
Details: Earth work in excavation in foundation trenches not exceeding 1.50 m width or 10 Sq.m. on plan or drains not exceeding 1.50 m in width or 10 Sq.m. on plan including dressing of sides and ramming of bottoms, lift upto 1.50 m including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.and supplying. Two coat of Zinc rich primer applied and two coat of Coal Tar Epoxy applied over primer. Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plinth Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 grade stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in: a) Foundations and plinth Centring and shuttering including strutting propping etc. and removal of form work for: a) Foundation, footings, bases of columns etc. and mass concrete. Random Rubble
Sector: Generation