Details: const. of 72 bedded boys hostels earthwork: earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning t cc work: providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. providing and laying cement concrete 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in :a) foundations and plinth filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. rcc: reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :b) m20 (1 cement : 1.5 coarse sa
Sector: Buildings