Details: (sh:- formation cutting) excavation in hill area in soil by mechanical means (excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) depositing of excavated earth on the barren valley side. (excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth on the barren valley side) excavation in hilly area in ordinary rock by mechanical means not requiring blasting. (excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres) disposal of excavated earth on the barren valley side. (excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of excavated earth on the barren valley side) sh
Sector: PWD