Details: (sh:earth work/widening) excavation in hill area in soil by mechanical means (excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) excavation in hilly area in ordinary rock by mechanical means not requiring blasting. (excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) (sh: 3mtr ht.rrm/retaining wall) excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) (i) ordinary soil (a) manual means (i)upto 3m depth(without de-watering) pcc 1:3:6 in foundation (plain cement concrete
Sector: PWD