Details: demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : 3 sq meters and below dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm providing and laying autoclaved aerated concrete(aac) blocks masonry with 150mm to 300 mm thick with grade-1 aac blocks of density 551 to 650 kg/ conforming to is:2185 (part 3) in super structure above plinth level up to floor v level with rcc band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of engineer-in-charge. (the payment of rcc band and reinforcement shall b
Sector: Police and Internal Security