Details: 1.sh:- academic and hostel building portion:- earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3m re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in : b) walls including attached
Sector: Education Misc