Details: dry dock no. iengaging of diving team (consisting of 2 nos. divers, 1 no. diving supervisor) for inspection of underwater site or cleaning/removing debris/unwanted materials or attending repair work of the site and other connected works, if any including cost of labour charges, divers, diving equipments, gst, labour welfare cess etc., complete. opening the caisson gate for docking /undocking of the vessel arrangements as directed by eic including all labour charges for running the diesel or electric pumps, opening the valves of the gate, cost of all labour charges, gst, labour welfare cess but excluding the hire charges of diesel and electric pumps, which will be supplied by the department on free of cost. closing the caisson gate after docking /undocking of the vessel, for making arrangements like block setting for docking of vessel (or) after undocking of the ship including all labour charges required for dewatering and floating the gate and thereafter pumping water to the tank
Sector: Harbor