Details: collection and delivery of raw water from various sources to water treatment plant through water tanker including the cost of carriage and delivery to filter bed etc. complete as per the direction of engineer-in-cahrge. the water pump at source and delivery point to be arranged by the contractor and the supply of water through water meter at the delivery point shall also be arranged by the contractor. korang nallah source to lal tikrey treatment plant upto lead of 25.00 kmi) period from ist january 2024 to 31th may 2024 (dependson onset of monsoon) korang nallah source to tugapur no. 6 treatment plant upto to a lead of 28.00 kmi) period from ist january 2024 to 31th may 2024 (dependson onset of monsoon)
Sector: PWD