Details: providing and fixing bolts including nuts and washers complete. steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works applying priming coat: with ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood) painting with synthetic enamel paint of approved brand and manufacture to give an even shade : two or more coats on new work providing and fixing flooring with 19 mm thick marine plywood (bwr) confirming to is: 710, 30 cm wide including fixing with nuts and bolts etc. complete.
Sector: PWD