Details: cutting/ dismantling of old balusters using cutter machine and stacking and disposing the same within a lead of 100-1000 mtrs including removing vegetation from the compound wall. (note: care to be taken while cutting/ dismantling of the baluster to avoid damage to the rcc beam/coping and floor base. the contractor at his cost shall provide temporary supports for holding the rcc beam/ coping prior to ). all tools, plants labour & material etc. complete. dismantling and clearing away the existing old architectural (flower pattern )rcc /concrete barrier on the compound wall including stacking the same and disposing the debris within a lead of 1.00 km. all tools, plants labour & material etc. complete. ( note : rate mentioned is for clearing architectural (flower pattern )rcc /concrete barrier on 3.25m approx. length panel with about 8.00 nos. approx. architectural (flower pattern )rcc /concrete barrier on each panel having ) demolishing rcc work in trap stone metal including sta
Sector: Harbor