Details: cutting the bituminous road for laying the pipeline in trenches for a width of 0.6m including labour, tools, etc. and disposing the excavated excess material from the trench to a distance of 1000 metres, including making level the trench surface by utilising the serviceable material to the level of the top surface of road, by compacting, watering ramming with rolling with road roller after completion of laying of pipe and refilling the trenches etc. complete as per the direction of engineer in charge. by manual means rural roads earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches, drains not exceeding 1.5 m in width 10sq.m on plan including dressing of sides ramming of bottoms for all lift including getting out the excavated soil & disposal of surplus soil for all lead and in all types of soft stratas comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties shingles, pebbles all types
Sector: PWD