Description: Repair of cross drainage at Kundaim Industrial Estate Name of Work Repair of cross drainage at Kundaim Industrial Estate
Details: Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed. All types of Ordinary rock including all types of laterite rock, blasting prohibited. Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level. Centering & shuttering including Strutting, Propping & removal of forms for : Foundations, Footings, Bases for columns Steel work welded in built up section and framed work including cutting, hoisting, fixing in position for steel grating of size 2.00 m x 1.10 m with R.S. joists, Tees, angles, flats and channels of TATA/ SAIL/ VIZAG make onlywi
Sector: Industry Development