Description: Operation and Maintenance of 100 M L D Salauli Water Treatment Plant and Intake at Xelpem under WTP Sub Div II Work Div XII PHE SWSP for a period of two years Name of Work Operation Maintenance of 100 M L D Salauli Water Treatment Plant and Intake at Xelpem under WTP Sub Div II Work Div XII PHE SWSP for a period of two years
Details: Providing / deploying the required staff / qualified engineers round the clock for the smooth operation of the 100 MLD WTP so as to give an output of 100MLD . Details of staff to be deployed is enclosed as per list A Providing of vehicle round the clock to attend breakdown/ repairs and any other emergency service required to be attended at the Water Treatment Plant. Maintenance and repair of actuators at the Intake pump house and clear water pump house with Providing and Fixing actuator card, spindle shafts, worm gear, bearings, transformers, limit switch, etc complete as required. Maintenance and repair of actuator at filter bed with Providing and Fixing actuator card, spindle shafts, worm gear, bearings, transformers, limit switch, etc complete as required.. Repair to chlorination unit with Providing and fixing of Injector for chlorinator- 1NosPressure relief valve-1 Nos Presssure regulator -1 Nos Gas filter -1 NosBall Valve - 1 Nos Vaccum gauge-1 Nos any other repairs involved to pu
Sector: PWD