Description: Construction of Septic tank and Soak Pit for Building A New Market Complex at Porvorim Name of Work Construction of Septic tank and Soak Pit for Building A New Market Complex at Porvorim
Details: Earthwork in exacavation by mechanical means (hydraulic excavator) /manual means in foundation pipeline trenches drain (not exceeding 1.5m in width 0r 10 sq.m on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus eacavated soil as directed within 50m b)All types of ordinary rock including all types of laterite rock, blasting prohibited Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing a) All works upto plinth level Laterite masonry in neatly dressed stones for 23 cms thick masonary walls in cement mortar 1:4 (1 cement : 4 coarse sand) in foundation upto plinth level 12 mm thick cement plaster 1:4 (1 cement:4 fi
Sector: Buildings