Description: Reinstatement of State Highway No 1 dug by water supply Division and electricity Department for laying water supply pipeline andunderground Cable in Bicholim constituency in Bicholim Taluka Name of Work Reinstatement of State Highway No 1 dug by water supply Division and electricity Department for laying water supply pipeline underground Cable in Bicholim constituency in Bicholim Taluka
Details: Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.as per MORTH Specification 301 Supplying of laterite stone soling of size 150-200 mm size and murrum having P.I. Value not more than 6 and laying including packing with smaller stones and consolidation with power road roller including spreading, watering and consolidation of binding material etc.(Measurements shall be considered on finished item) . Providing and laying 50mm(consolidated thickness)full grout using granitic or basaltic stone of specified grading at 6.00 cu.m. per 100 sq.m. grouting with hot bitumen straight run bitumen(or with such bituminous material of grade and type as specified by the Engineer-in-Charge)at 5.0kg. per sq. m. binding with key aggregate of granitic or basaltic stone of specified
Sector: PWD