Details: earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : all kinds of soil rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: all works upto plinth level providing and laying 25 mm shahabad stone flooring over 25 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) laid over with grey cement slurry mixed with pigment, including. rubbing and polishing complete. providing and laying in design & patte
Sector: PWD