Details: demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving:a) upto 2.5 meters long pile driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) : a) upto 2.5 meters long pile earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, sand, silt, gravel moorum of all varieties, shingles, pebbles, all types of conglomaretes, laterite rock, soft rock ordinary, disintegrated rock, or weathered rock, fissured/shattered decomposed rock and such other materials either in full or in parts as the case may be adopting any approved method or methods as m
Sector: Water Resource Department