Details: clearing grass and removal of upto a distance of 50 m outside the periphery of the area earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. all kinds of soil dismantling tiled roofing (mangalore or or country tiles) with battens etc. complete including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. dismantling wood work of sectional area 40 sq.cm. and above wrought framed and fixed in frames, other frames and trusses including stacking of material within 50 mts. lead (span upto 10 mtrs.) providing & laying mangalore tiles roof covering over m25 grade precast cement concrete rafters placed @ 60cm c/c apart fixed with adhesive such as bal end
Sector: PWD