Details: excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankement upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.as per morth specification 301 rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : a)all works upto plinth level centering & shuttering including strutting, propping & removal of forms for : i)foundations, footings, bases for columns supplying and fixing of precast rcc slabs(factory made,the factory should be iso cert
Sector: PWD