Details: miling of bituminous pavement upon depth of 50 mm by cold milingmachine including all levelling and sensors,self-loading of milledmaterial by discharge conveyor onto transport vehicles directed by engineer in charge. providing and applying tack coat with bitumen grade of 80/100 or bitumen emulsion using pressure distributor on the prepared bituminous/granular surface cleaned with mechanical broom as per mort&h specifications clause 503. bitumen 80/100@ 0.375 kg/sq.m providing and laying bituminous macadam with 40-60 tph hot mix plant producing an average output of 50 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder to the specified percentage of total mix , transported to site, with all leads laid over a previously prepared surface with sensor paver finisher to the required grade, level and alignment and rolled with smoth wheeled roller and vibratory roller to achieve th
Sector: PWD