Details: construction of embankement with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required and compacting with static roller to meet requirement of table 300-2 as per morth specification 305 demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a leadof 50 m.a)all kinds of soil rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. centering and shuttering including struttings, propping etc. and removal of formwork for :a) foundations, footings, bases
Sector: RDPR