Details: demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. dismantling steelwork in single sections in channels, angles, tees and flats including dismembering and stacking within 50 mts. lead dismantling asbestos sheet roofing including ridges, hips valley and gutters and stacking the material within 50 meters lead. demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a)all kinds of soil rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline tre
Sector: RDPR