Details: demolishing r.c.c. work including stacking of steel bars & disposal of unserviceable within 50 mts. lead. demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. demolishing brick work in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.: (a) all kinds of soil rubble packing with hard laterite stone under floors including watering, ramming & consolidating etc. complete. providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggr
Sector: RDPR