Details: dismantling steelwork in built up sections in angles, tees, flats and channels including all gusset plates bolts, nuts, cutting dismembering and staking within 50 mts. lead dismantling asbestos sheet roofing including ridges, hips valley and gutters and stacking the material within 50 meters lead. earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a)all kinds of soil rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 20 m nominal size) excluding cost of centerin
Sector: RDPR