Details: dismantling/taking out kids play station items carefully without damage and stacking serviceable materials and disposing the unserviceable materials from the site and re-installing the play station at new location with proper fixing including replacement of damaged structural member and increasing the length of structural member for grouting in cement concrete with c class gi pipes wherever required or as per direction of engineer-in-charge including the cost of all materials, labours, tools & plants and all other charges etc., complete but excluding cost of cement concrete and centering and shuttering. clearing jungle including uprooting of rank vegetation, grass, brush wood, bushes, shrubs, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared or as directed by engineer in-charge. the rate is inclusive of supply of all labour, tools & plants etc., complete. excavation
Sector: Harbor