Details: clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of upto a distance of 50 mt. outside the periphery of the area cleared. (if however only grass is met with the area will be measured and paid for under item 4001). clearing grass and removal of upto a distance of 50 m outside the periphery of the area cutting of branches of trees beyond 30 cm and upto 60 cm girth & stacking the serviceable material and disposal of unserviceable material for all leads : cleaning the night soil waste chamber, sludge and other waste by removing the cover slabs and relaying including disposal of sludge by excavating pits and covering the same with mud as per directions of engineer in charge earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides
Sector: PWD