Details: demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. transportation and carriages of material by tipper truck including loading, unloading and stacking (a) lime,building , manure sludge, moorum excavated rock . vii) 15kms. providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) all works upto plinth level cement concrete pavement (25 mm to 50 mm thick) with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) including finishing complete *: per extra kg. of redoxide used for each 50 kg of cement. removal of existing epdm material and installation of 10mm sbr (styrene butadiene rubber) base and applying 5mm top layer using a sandwich system with a single colour spray on finish. providing periodic maintenance of the 10mm sbr base and 5mm top layer with sandwich system with a single col
Sector: PWD