Details: excavation for roadway in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements on lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per morth specification 301 rubble packing with hard laterite stone under floors including watering ramming and consolidating etc in pipeline trenches and other foundation complete. centering and shuttering including struttings, propping etc. and removal of formwork for providing and laying cement concrete 1:2:4 ( 1 cement: 2 coarse sand : 4 graded granitic or basaltic stone aggregate: 20 mm. nominal size) excluding cost of centering, shuttering and finishing in :a) all works upto plinth level supplying and fixing of precast rccslabs(factory made,the factory should be iso certified and registered under dirctorate of industries, govt. of india) at site in concrete grade of m-25 with
Sector: RDPR