Details: earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. (a) all kinds of soil rubble packing with hard laterite stone under floors including watering, ramming & consolidating etc. complete providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : (a) all works upto plinth level centering and shuttering including struttings, propping etc. and removal of formwork for : (a) foundations, footings, bases for columns and mass concrete. supplying and fixing of precast rcc slabs(factory made,the factory should be iso certified and registered under dirctorate of
Sector: RDPR