Details: cutting the bituminous road for laying the pipeline in trenches for a width of 0.6m including labour , tools etc, and disposing the excavated excess material from the trench to a distance of 1000 metres, including making level the trench surface by utilising the serviciable material to the level of the top surface of road, by compacting, watering ramming with rolling with road roller after completion of laying of pipe and refilling the trenches etc. complete as per the direction of engineer incharge. by manual means rural roads earthwork in excavation in all types of stratas comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varities, shingles, pebbles all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock, fissured/shuttered / decomposed rock or weathered rock and all such other materials described under appendix-a to those specifications either in full or in parts as the case may be, adopting any a
Sector: PWD