Details: earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline tranches drain (not exceeding 1.5 m in width or 10 sq.m on plan ) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. a) all type of soil rubble packing with hard laterite stone under floors including watering ramming and consoliding etc. in pipeline tranches and other foundations complete providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggregate. 40 mm. nominal size ) excluding cost of centering, shuttering and finishing in: all works upto plinth level centering & shuttering including strutting propping & removal of forms for foundations, footings, bases for columns providing and laying in position cement 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40m. nominal size
Sector: RDPR