Details: earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5m width or 10 sq.m on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) all kinds of soil rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggregate 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) all works upto plinth level providing & laying in position (1.2.4) reiforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement (1 cement : 2 coarse sand: 4 graded stone agg 20 mm nominal size) a) all works upto plinth level providing high
Sector: RDPR