Details: clearing grass and removal of upto a distance of 50 m outside the periphery of the area. earthwork in excavation over areas in saturated soil (exceeding 0.30 m upto a depth of 0.60 m) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m disposed earth to be neatly dressed and leveled including pumping or bailing out water providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:all works upto plinth level. centering and shuttering including struttings, propping and removal of forms for:foundations, footings, bases for columns. providing and fixing pvc water seal in construction joints as per design and drawing shall withstand the pressure to the tune of 5 kg/cm2 of approved quality and conforming top relevant is code and shall be of one piece and jointing of small pieces shall be avoided, the norminal width shall not be less than 305m
Sector: Water Resource Department