Details: earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. hard rock where blasting prohibited rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. providing anti – termite treatment to buildings conforming to i.s.s. 6113 part ii 1971 (revised) including adopting precautions for health hazards and safety measures as required therein with the cost of all materials, chemicals, plants, equipments required for the treatment and furnishing a guarantee for a minimum period of 10 years fromthe date of completion including eradicating any infestation of termite freeof costduringtheguaranty periodcomplet
Sector: RDPR