Details: earthwork in excavation by mechanical means (hydraulic excavator) in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sq. m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m all types of ordinary rock including all types of laterite rock, blasting prohibited cutting the bituminous road for laying the pipeline in trenches for a width of 0.6m including labour, tools, etc. and disposing the excavated excess material from the trench to a distance of 1000 metres, including making level the trench surface by utilising the serviceable material to the level of the top surface of road, by compacting, watering ramming with rolling with road roller after completion of laying of pipe and refilling the trenches etc. complete as per the direction of engineer in charge. by manual means : rural roads supplying at store or site of work inclu
Sector: Industry Development