Details: demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within all lead and lift as per direction of engineer - in- charge. earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms within all lead and lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all lead and lift. a. all kinds of soil as per entire satisfaction and direction of engineer -in-charge including carriage of material within all lead and lift. excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
Sector: Science University