Details: structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per entire satisfaction and direction of engineer-in-charge including carriage of material in all leads and lifts. providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from m.s. sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per is : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37 mm, at 1200 mm centre to centre, one fixed to the ceiling with dash fastener 12.5 mm dia x 50 mm long with 6 mm dia bolts, other of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate g.i. channels 45x15x0.9 mm running at the spaci
Sector: Science University