Details: excavation in foundation, trenches etc. in earth work in all kind of soil lifts upto 1.50 mtrs. stacking the excavated soil not more than 3 mtrs. clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundation etc. consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth including carriage of materials through all modes of transportation with in all leads and lifts, as per pwd specifications and as per direction of the engineer-in-charge. providing & laying cement concre 1:4:8 (1cement: 4sand: 8graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of materials through all modes of transportation with in all leads and lifts, as per pwd specifications and as per direction of the engineer-in-charge. providing from work with steel plates 3.15mm thick weled with angle iron in frame 30x30x5mm
Sector: Industry Development