Description: ERECTION CONSTRUCTION OF PUF STRUCTURE TOILET BLOCK WITH SEPTIC BIO TANK AT ACCLM CENTER THANGU OF 13TH BN ITBP Name of Work Erection Construction of PUF structure toilet block with septic bio tank at Acclm Center Thangu of 13th Bn ITBP
Details: Earth work in excavation by mechanical means (Hydraulic excavator) / manual mean foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil Earth work in excavation by mechanical means (Hydraulic excavator) / manual mean foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 , Providing and laying in position cem
Sector: Police and Internal Security