Details: earthwork in excavation for structures as per drawing and technical specification clause 305 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 (fifty) metre dressing of sides and bottom and backfilling in trenches with excavated suitable material and as per the directions and entire satisfaction of engineer-in-charge. the rate is including octroi, royality, gst, toll tax, sale tax or other taxes imposed by the government. providing and laying mechanically mixed and vibrated plain cement concrete in open foundation for all type of structure complete using plain cement concrete grade m-10 ( m ten) per cubic metre nominal mix 1:3:6 (one cement is to three sand is to six crushed stone agg. 40mm( forty millimetre) nominal size) in or under water and curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arrise at the time of laying u
Sector: PWD