Details: dismantling tile work in floors and roofs laid in cement mortar including stacking material within all leads and lifts, complete in all respect as per the direction of engineer-in-charge. (a) for thickness of tiles above 25 mm and upto 40 mm demolishing cement concrete manually/ by mechanical means including disposal of material within all leads and lifts, complete in all respect as per the direction of engineer-in-charge. (a) nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering within all leads and lifts, complete in all respect as per the direction of engineer-in-charge. - all work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 gradedstone aggregate 20 mm nominal size) repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the
Sector: Religious building