Details: part of 63 kva s/stn :-excavation of earth in all kinds of soil for pole pits (size1800 x1200 x 1500mm), stay set pit (size 900 x700 x 1900mm) ,earthing set pit (2 mtr. dia &3 mtr. depth), drilling of holes in poles and x-arms, preparation of plateform, structure members, ci/ai x-arms , of double poles with rcc with concrete filling, of plateform for transformer, x-arms, g o switch, dropout fuse unit, lightening arrestor, etc., of stay set, of 63kva, 22/.4kv transformer,lt panel box, lt cable, trivector meter, filling and ramming of pits, of jumpers, lt earthing and fixing of barbed wire and painting of sub-station structure(duoble coat) complete in all respect as directed by engineer-in charge . mannual carriage:- mannual carriage of 63 kva, 22/.4 kv transformer alongwith allied material for an average lead of 0.100km from road head to site of work. (rate to be quoted for 1 km lead only) providing and supply of material prov. rcc 2000 mm with c:c 1:2:4 (1 cement
Sector: Distribution